Open Accessibility Menu
Hide

Case Studies We Set Industry Standards

  • Search
  • Midlothian Case Study - Tilt Wall Panel Underpinning & Lifting

    A 686,000 ft 2 office/warehouse was under construction for Sunrider International in Midlothian, TX. The building consisted of 9 ¼” thick tilt wall panels and steel columns supported on 24” diameter under reamed concrete piers. Soon after the panels ...

    Read More
  • Seismic Retrofit - Custom Micropile Brackets

    Originally built in 1979, the warehouse was constructed for General Motors Corporation as a parts distribution center. The 634,000 ft^2 facility included dozens of truck dock openings and an interior railroad spur for the unloading of train cars ...

    Read More