  • Cargill Hexane Gas

    PROBLEM A challenging issue arose when the footings of a structure settled by a substantial 7 inches, leading to a noticeable flex in the gas line. This presented a potential hazard and called for urgent remediation to prevent further damage and ...

    Read More
  • Buckman Chemical Lab - New Construction

    Specializing in manufacturing chemicals for water treatment, pulp, paper, and leather industries, the Buckman Chemical Lab in Memphis, Tennessee ran into an unforeseen problem when attempting to install two new chemical tanks. The 3500 and 6500 ...

    Read More
  • Brandywine Industrial Warehouse Settlement Rectified Using Driven Piles

    Warehouse in Chula Vista Rectified Using Ram Jack Driven Piles Chula Vista Ram Jack Pacific was called to a 28 ft. tall concrete property. This industrial warehouse building forms part of a larger commercial development. Judging from an “as-graded” ...

    Read More
  • Tyndall Air Force Base

    Panama City, Florida is hurricane country. Reaching up to 160 mph hour, hurricane winds off the Gulf of Mexico repeatedly damage structures in the region. Tyndall Air Force Base Hangar 4 is no exception.

    Read More
  • Louis Rich Turkey Processing Plant

    Introduction: When you’re a business manager or owner whose livelihood depends on the structure in which your business takes place, there’s nothing worse than having to deal with an activity-halting repair. So it’s no surprise the owner of the Louis ...

    Read More
  • Grain Bin Foundation Failure and Recovery

    Ram Jack Supports Converted Steel Grain Bin​ Columbia, MO​ Over 15 years ago, primary manufacturers of livestock feed and suppliers of plant food and crop protection products, MFA Incorporated ran into problems with the placement of a large grain bin ...

    Read More