Slab Support in Durham
Slab Support Using Floor Slab Support
After installing helical anchors through the floor slab, the floor is raised mechanically and supported on firm strata. Once the floor is raised, cement is added to provide equal support.
Ram Jack stands behind every job with a transferable Life of Structure Warranty on all Ram Jack residential foundation systems.
Slab Support Using Pressure Grouting
Ram Jacks slab raising process forces a special cement/soil grout under the sunken concrete and lifts it to its original position. Its faster, cleaner and a fraction of the cost of replacement.
Keep your family and home safe. Make an appointment with Ram Jack Raleigh/Durham or start by calling (919) 373-3875.